Hello! I’m looking into applying for the BSCN program at Keyano for Sept 2027
I would be considered a mature student.
I sent Keyano an email already but just looking to see if any of you may know some answers to my questions while I wait for them to respond to me!
First of all I know on their website mature student entrance requirements are listed separately from the main entrance requirements but do I still need my 30 level math to get in? (ETA: I don’t currently have a 30 level math course, mainly wondering if it would be beneficial to take an upgrading course to get it or if they would even count that course toward my overall average/gpa calculation)
Second, I know that the entry is competitive but I’m wondering if as a mature student I’m placed against students right out of high school or if I’d only be compared to other mature students applying, since I believe the requirements are different?
Any other information anyone can share about applying for school, applying for funding, or tips while in school or preparing for it, would be very much appreciated
Thanks!! ❤️❤️
Hey everyone, I recently accepted a 12-month engineering internship at Suncor Base Plant starting this September and I’m trying to figure out housing in Fort McMurray.
For people familiar with Fort McMurray/Base Plant, what areas would you recommend? and what buildings/property companies should I look into or avoid? I would prefer covered/underground parking for winter.
The Petrochemical Tradesman Fucks-Given Transfer Function
An electrical/control-systems model for refinery inspection, maintenance, and repair morale
Thesis
In refinery maintenance, turnaround work, vessel entry, and inspection trades, the Fucks-Given Coefficient is not constant. It fluctuates dynamically with weather, shutdown schedule compression, scaffold quality, hydrocarbon exposure, permit-office friction, coffee saturation, and whether the weld cap was ground flush enough for MT.
Gp(t) is the petrochemical fucks-given signal over time: the available useful caring, craft pride, attention, and willingness to keep grinding, inspecting, documenting, welding, and re-checking without mentally walking into traffic.
Dp(t) is the petrochemical do-not-give-a-fuck load over time: the accumulated drag from night shift, frozen lines, wet gloves, failed RT, paperwork recursion, scaffold crimes, mystery sludge, and Operations asking whether the vessel can be opened sooner.
Transformer effect of overtime pay, LOA, double-time Sundays, and shutdown completion bonuses
Step-up transformer
Cs
Coffee saturation level; also includes gas-station breakfast sandwiches and whatever was in that thermos
Capacitor bank
Ut
UT productivity: thickness checks, scan grids, C-scan discipline, and not losing the couplant bottle
Diagnostic signal amplifier
Mt
MT enthusiasm after grinding/buffing welds until they look like chrome but still somehow have linear indications
Flux density
Rt
RT completion motivation; rises when shots pass, collapses when the film shows another slag inclusion
High-voltage pulse source
Wr
Welding repair pride factor: bead quality, root confidence, and the sacred belief that this one will pass first time
Current gain
Sf
Scaffold friendliness coefficient: access, tags, planks, handrails, and whether the workface was designed by a human
Circuit stability
Rf
Rain/freezing weather resistance: wet gloves, icy ladders, frozen air lines, and the special misery of sleet down the neck
Ohmic resistance
Hs
Heat stress, hydrocarbon exposure, confined-space funk, and mystery vessel sludge
Thermal losses
Pm
Permit meeting duration, gas-test delays, LOTO debate loops, and the phrase “just waiting on Operations”
Signal attenuation
Bs
Buffing and grinding repetition fatigue: every weld becomes a philosophical argument with a flap disc
Resistive drag
Lo
Locked-out bolts remaining: seized, painted, rounded, or located where elbows do not bend
Mechanical impedance
Gc
Gas-test compliance paperwork and the ritual hunt for the one person authorized to sign Box 7
Rectifier losses
Ns
Night-shift circadian destruction: 3 AM vessel entry, dead radio battery, and lunch at breakfast time
Frequency distortion
Ic
Inverter correction from good crew morale, competent supervision, and weaponized dark humor
Signal phase correction
Er
Emergency repair adrenaline when the plant manager appears wearing clean coveralls
Voltage spike
Cf
Capacitor-stored last remaining fucks reserved for hydrotests, rework, and “quick little repairs”
Energy storage
Interpretation of the System
High Performance State: f(F) > 2
· Coffee is flowing, LOA is real, the shutdown bonus has not been exposed as a myth, and the crew has entered productive sarcasm mode.
· UT locations are accessible, MT prep is reasonable, RT boundaries are controlled, and weld repairs are passing without becoming a Greek tragedy.
· Nobody has yet said: “We just need one more spot UT’d.”
Neutral Equilibrium: f(F) = 1
· The tradesman is functioning mechanically. Compliance remains, enthusiasm has left the site.
· Observable signs include dead-eyed “copy that,” silent staring at permits, frozen hose-kicking, and asking who signed off the isolation.
· At this level, the system still performs work, but only because habit and JSA paperwork are carrying the load.
Catastrophic Fucks Collapse: f(F) < 1
· Usually triggered by opening a vessel that still has pressure, failed RT after rework, rain on night shift, missing scaffold tags, or Operations asking if the job can be hurried up.
· The inverter can no longer stabilize morale, the capacitor reserves are depleted, and all remaining signal energy dissipates into existential heat loss.
· At collapse, the only remaining output is paperwork, muttering, and the acoustic signature of a grinder being set down too hard.
Dynamic System Components
Transformer - Tw
Boosts total fucks given through overtime, LOA, per diem, pride, and the visible approach of demobilization. Saturation occurs after 21 consecutive shifts or any 3 AM request that begins with “real quick.”
Rectifier - Gc / System Drag
Converts alternating motivation into unidirectional suffering. Most active during buffing welds for MT, waiting on RT shots, cleaning couplant off elbows, and torqueing flange bolts in sleet.
Inverter - Ic
Synchronizes morale using dark humor, coffee, competent foremen, shared hatred of paperwork, and the spiritual bonding that occurs when everyone knows the plan is bad but legal.
Capacitor Bank - Cf
Stores emergency reserves of caring for hydrotests, rework, failed PWHT, and “quick little repairs.” Discharge accelerates sharply after the phrase “it should only take an hour.”
Three Broad Operating Scenarios Over Time
The graph below shows three broad states: fucks surplus, neutral/mechanical compliance, and catastrophic collapse. The dashed line marks f(F) = 1, where Gp(t) and Dp(t) are equal.
Field-Tested Empirical Rule
f(F) ≈ 0
This condition is approached when all of the following occur simultaneously: